0,00 €
Estimate language for the client
Choose the language on the PDF and signing link.
Your info and your client's
Line items and costs
Optional add-ons
The client checks the ones they want before signing.
Itemize bathroom & kitchen remodels with crystal-clear scope boundaries, allowance notes, waterproofing specs, tile work, and built-in Change Order protection.
Choose the language on the PDF and signing link.
The client checks the ones they want before signing.
The calculator is free to use; you only pay to remove the watermark.
Starting waste allowances and scope checkpoints to review before sending your quote.
| Material / item | Waste | Site note |
|---|---|---|
| Standard-format tile | 10% | Perimeter cuts; check niches and pattern. |
| Cement backer board | 10% | Cuts at corners and utility penetrations. |
| Sheet waterproofing membrane | 10% | Laps and corner pieces for the selected system. |
Carry a purchase allowance with quantity and unit price; revise it once the tile is selected.
With 10% for laps and cuts, 300 x 1.10 = 330 sq ft; do not add laps already measured.
It also changes framing, waterproofing, cuts, and labor; price the complete assembly.