BC BidCraft Estimates for contractors
Pricing

Post-Construction Cleaning Estimate Calculator & Proposal PDF

Price rough, final, and touch-up post-construction cleaning accurately by square footage. Covers HEPA fine-dust extraction, sticker/paint removal on glass, and fixture sanitization.

Your profit · private

0,00 €

35 % margin
Materials and labor 0,00 €
Added for waste 0,00 €
Deposit due 0,00 €

Estimate language for the client

Choose the language on the PDF and signing link.

Your info and your client's

Line items and costs

Optional add-ons

The client checks the ones they want before signing.

Pricing

The calculator is free to use; you only pay to remove the watermark.

Single estimate
$9 USD
One-time payment · 1 job
  • PDF without watermark
  • Your company name and phone on top
  • Client signs on their phone
  • Up to 3 change orders on that job
Lifetime license
$79 USD
One-time payment, no monthly fees
  • Unlimited estimates without watermark
  • Quote in USD, EUR, or MXN
  • Signed timestamp and SHA-256 record
  • 14-day full refund guarantee

Cleaning supplies and return visits

Starting waste allowances and scope checkpoints to review before sending your quote.

Typical material waste allowances

Material / item Waste Site note
Prepared cleaning solution 5% Transfer residue; use the manufacturer dilution.
Light-debris bags 10% Tears and bags that cannot be filled completely.
Disposable floor protection 10% Cuts at entries and edges.

Scope checklist before signing

  • Separate rough clean, final clean, and touch-up visits.
  • Count glass panes, cabinet interiors, and hard-to-reach areas.
  • Record whether other trades will create dust after cleaning.
Does supply waste increase cleaning hours?

Not automatically. Apply the allowance to supplies and estimate labor from condition and access.

How do I allow for extra bags?

40 planned bags x 1.10 = 44 bags; price debris hauling separately.

Should I include a free return trip?

State the included visits and price new dust from later trade work separately.

Practical estimating guides